Fountain Creek Watershed Feasibility Study Act of 2007
A bill to authorize the Chief of Engineers to conduct a feasibility study relating to the construction of a multipurpose project in the Fountain Creek watershed located in the State of Colorado.
Other Bill Titles (2 more) 11/16/2007--Introduced.
Fountain Creek Watershed Feasibility Study Act of 2007 - Directs the Chief of Engineers to complete a study to determine the feasibility of constructing a multipurpose project that shall:
(1) be located in the Fountain Creek watershed, Colorado; />(2) consist of one or more dams or other structures, other facilities, or management activities or one or more other reservoirs that are to be located on- or off-channel of the watershed; and
(3) with respect to the area located in the watershed and the Arkansas River Valley and any residential or commercial activity therein, be designed to provide more reliable flood control and better sediment control, to increase the water supply, to improve water quality, and to conserve fish and wildlife and preserve the ecosystem located close to the project.
Requires the Chief to:
(1) take into consideration the Supplemental Report on Fountain Reservoir and Reevaluation of Report on Review Survey for Flood Control and Allied Purposes, Arkansas River and Tributaries Above John Martin Dam, Colorado, dated May 15, 1970, and the Fountain Creek Watershed Study prepared by the Corps of Engineers; and
(2) conduct the study independently from the Fountain Creek watershed, the Fryingpan-Arkansas Project, or the proposed Southern Delivery System Project.
... moreSee Full Bill Text
Committees
Amendments
This bill has no amendments.
Bill Status
| Introduced | ![]() | Voted on by Senate | ![]() | Voted on by House | ![]() | Considered By President | ![]() | Bill Becomes Law |
| November 16, 2007 |
In the News
We are not currently finding any news articles on this topic using our daily automated search of Google News. However, if you know of a relevant news article to display here, OpenCongress site editors have the ability to add it manually. Simply e-mail us the web address of this page and the web address of your suggested news article: We'll post relevant links as quickly as possible. Also, if this topic is important to you, you could write a letter to the editor -- if a news article refers this specific topic by name, a link to that news article is likely to appear here soon.
Blog Coverage
August 26, 2008 The Pueblo Chieftain Online :: Dam study likely wonât get funds ...
Salazar introduced a bill to study a dam or series of dams on Fountain Creek in November (S.2384), but the bill has not advanced. In May, Salazar fast-tracked the proposal with the resolution, which requires the Corps study. ...
May 22, 2008 Congress Authorizes Senator Salazarâs Fountain Creek Flood Control ...
The resolution, derived from Senator Salazarâs Fountain Creek Watershed Feasibility Study Act of 2007 (S.2384), tasks the Army Corps of Engineers with studying the feasibility of constructing a multipurpose project consisting of one or ...
November 15, 2007 Bill Action: Introduced: S. 2384: A bill to authorize the Chief of ...
Ken Salazar [D-CO] introduced S. 2384: A bill to authorize the Chief of Engineers to conduct a feasibility study relating to the construction of a multipurpose project in the Fountain Creek watershed located in the State of Colorado. ...











Rating Filter: 5
Comments
No Comments
Add A Comment