Received; read twice and referred to the Committee on Energy and Natural Resources
September 27, 2010
Reported by Mr. BINGAMAN, with an amendment
[Omit the part struck through and insert the part printed in italic]
To amend the Reclamation Wastewater and Groundwater Study and Facilities Act to expand the Bay Area Regional Water Recycling Program, and for other purposes.
‘SEC. 16XX. CCCSD-CONCORD RECYCLED WATER PROJECT.
‘(a) Authorization- The Secretary, in cooperation with the Central Contra Costa Sanitary District, California, is authorized to participate in the design, planning, and construction of recycled water distribution systems.
‘(b) Cost Share- The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
‘(c) Limitation- The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
‘(d) Authorization of Appropriations- There is authorized to be appropriated to carry out this section $1,800,000.
‘SEC. 16XX. CENTRAL DUBLIN RECYCLED WATER DISTRIBUTION AND RETROFIT PROJECT.
‘(a) Authorization- The Secretary, in cooperation with the Dublin San Ramon Services District, California, is authorized to participate in the design, planning, and construction of recycled water system facilities.
‘(b) Cost Share- The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
‘(c) Limitation- The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
‘(d) Authorization of Appropriations- There is authorized to be appropriated to carry out this section $1,150,000.
‘SEC. 16XX. PETALUMA RECYCLED WATER PROJECT, PHASES 2A, 2B, AND 3.
‘(a) Authorization- The Secretary, in cooperation with the City of Petaluma, California, is authorized to participate in the design, planning, and construction of recycled water system facilities.
‘(b) Cost Share- The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
‘(c) Limitation- The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
‘(d) Authorization of Appropriations- There is authorized to be appropriated to carry out this section $6,000,000.
‘SEC. 16XX. CENTRAL REDWOOD CITY RECYCLED WATER PROJECT.
‘(a) Authorization- The Secretary, in cooperation with the City of Redwood City, California, is authorized to participate in the design, planning, and construction of recycled water system facilities.
‘(b) Cost Share- The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
‘(c) Limitation- The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
‘(d) Authorization of Appropriations- There is authorized to be appropriated to carry out this section $8,000,000.
‘SEC. 16XX. PALO ALTO RECYCLED WATER PIPELINE PROJECT.
‘(a) Authorization- The Secretary, in cooperation with the City of Palo Alto, California, is authorized to participate in the design, planning, and construction of recycled water system facilities.
‘(b) Cost Share- The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
‘(c) Limitation- The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
‘(d) Authorization of Appropriations- There is authorized to be appropriated to carry out this section $8,250,000.
‘SEC. 16XX. IRONHOUSE SANITARY DISTRICT (ISD) ANTIOCH RECYCLED WATER PROJECT.
‘(a) Authorization- The Secretary, in cooperation with the Ironhouse Sanitary District (ISD), California, is authorized to participate in the design, planning, and construction of recycled water distribution systems.
‘(b) Cost Share- The Federal share of the cost of the project authorized by this section shall not exceed 25 percent of the total cost of the project.
‘(c) Limitation- The Secretary shall not provide funds for the operation and maintenance of the project authorized by this section.
‘(d) Authorization of Appropriations- There is authorized to be appropriated to carry out this section $7,000,000.’.
(b) Project Implementation- In carrying out sections 1642 through 1648 of the Reclamation Wastewater and Groundwater Study and Facilities Act, and the sections added to such Act by subsection (a), the Secretary shall enter into individual agreements with the San Francisco Bay Area Regional Water Recycling implementing agencies to fund the projects through the Bay Area Clean Water Agencies (BACWA) or its successor, andshall [Struck out->]shall[<-Struck out] may include in such agreements a provision for the reimbursement of construction costs, including those construction costs incurred prior to the enactment of this Act, subject to appropriations made available for the Federal share of the project under sections 1642 through 1648 of the Reclamation Wastewater and Groundwater Study and Facilities Act and the sections added to such Act by subsection (a).
(c) Clerical Amendments- The table of contents of the Reclamation Projects Authorization and Adjustment Act of 1992 (43 U.S.C. prec. 371) (as amended by section 512(a) of the Consolidated Natural Resources Act of 2008) is amended by adding at the end the following:
‘Sec. 16XX. CCCSD-Concord recycled water project.
‘Sec. 16XX. Central Dublin recycled water distribution and retrofit project.
‘Sec. 16XX. Petaluma recycled water project, phases 2a, 2b, and 3.
‘Sec. 16XX. Central Redwood City recycled water project.
‘Sec. 16XX. Palo Alto recycled water pipeline project.
‘Sec. 16XX. Ironhouse Sanitary District (ISD) Antioch recycled water project.’.
(a) Antioch Recycled Water Project- Section 1644(d) of the Reclamation Wastewater and Groundwater Study and Facilities Act (43 U.S.C. 390h-27) (as amended by section 512(a) of the Consolidated Natural Resources Act of 2008) is amended by striking ‘$2,250,000’ and inserting ‘$3,125,000’.
(b) South Bay Advanced Recycled Water Treatment Facility- Section 1648(d) of the Reclamation Wastewater and Groundwater Study and Facilities Act (43 U.S.C. 390h-31) (as amended by section 512(a) of the Consolidated Natural Resources Act of 2008) is amended by striking ‘$8,250,000’ and inserting ‘$13,250,000’.
Passed the House of Representatives October 15, 2009.
Attest:
LORRAINE C. MILLER,
Clerk.
Calendar No. 611
111th CONGRESS
2d Session
H. R. 2442
[Report No. 111-325]
AN ACT
To amend the Reclamation Wastewater and Groundwater Study and Facilities Act to expand the Bay Area Regional Water Recycling Program, and for other purposes.
September 27, 2010
Reported with an amendment